Construction waste recycling business
1. Total project Cost Rs 10 Lac as per PMEGP
2. Space requirement 250 Sq. ft To500 sq ft.
3. Construction waste recycling business Cost Rs 6lac.
4. interior and other expensesRs 4 lac
Cosmetic & Gift Shop Project Report
1. Total project Cost Rs 8 Lac as per PMEGP
2. Space requirement 250 Sq. ft To 500 sq ft.
3. Product stock Cost Rs 6lac.
4. interior and other expenses Rs 2 lac
Disposable Syringe Manufacturing Plant project report
1. Total project Cost Rs 2crore as per CGTMSE Scheme
2. Land requirement is 3000 Sq.ft.
3. Disposable syringe manufacturing small plant Cost Rs 1.5 crore.
4. Per Day injection syringe manufacturing depends upon the market demand.
Fly Ash Bricks Project Report
1. Total project Cost Rs 30 Lac as per CGTMSE Scheme
2. Land requirement is 8000 Sq.ft To 1 Acre
3. Machine Cost Rs 1660000 fully automatic fly ash bricks and paver block machine
4. Per Day Ten Thousand Bricks Production capacity machine
Gift and Cosmetic shop Project Report
1. Total project Cost Rs 8 Lac as per PMEGP
2. Space requirement 250 Sq. ft To 500 sq ft.
3. Product stock Cost Rs 6lac.
4. interior and other expenses Rs 2 lac
Grocery Store / Mini Supermarket Project Report
1. Total project Cost Rs 16 Lac as per PMEGP
2. Space requirement 500 Sq. ft To1000 sq ft.
3. Product stock Cost Rs 8lac.
4. interior, working capital and other expenses Rs 8 lac
Manufacturing of distemper and paint form cowdung
1. Total project Cost Rs 10 Lac as per MUDRA
2. Space requirement 250 Sq. ft To 500 sq ft.
3. Manufacturing of distemper and paint form cowdung Cost Rs 6lac.
4. interior and other expenses Rs 4 lac
Masala Factory Project report
1. Total project Cost Rs 16 Lac as per PMEGP
2. Land requirement is 1200sq. ft.
3. All Machine Cost Rs 8 lac fully automatic.
4. working capital, raw material and other expenses Rs 8 lac
Oxygen Plant Project Report
1. Total project Cost Rs 2crore as per CGTMSE Scheme
2. Land requirement is 3000 Sq.ft.
3. Disposable syringe manufacturing small plant Cost Rs 1.5 crore.
4. Project report is prepared by CA.
Paper Plate Project report
1. Total project Cost Rs 10 Lac as per PMEGP
2. Land requirement is 1200sq. ft.
3. Machine Cost Rs 4 lac fully automatic Paper Plate
4. working capital, raw material and other expenses Rs 6lac
Poultry farming project report
1. Poultry farming total project Cost Rs 10 lac as per CGTMSE Scheme
2. Land requirement is 2000 Sq.ft.
3. 2000 chickens can be farmed.
4. Project report is prepared by CA.
Readymade cloth Shop
1. Total project Cost Rs 10 Lac as per MUDRA
2. Space requirement 250 Sq. ft To 500 sq ft.
3. Stock of cloth Shop Rs 5lac.
4. interior and other expenses Rs 5 lac