Bamboo Shoot business
1. Total project Cost Rs 11.25 Lac as per PMEGP
2. Land requirement is 500 Sq.ft To 1000 sq ft.
3. Bamboo shoot project report as per bank standard.
4. Made by CA .
Construction waste recycling business
1. Total project Cost Rs 10 Lac as per PMEGP
2. Space requirement 250 Sq. ft To500 sq ft.
3. Construction waste recycling business Cost Rs 6lac.
4. Machine and other expenses Rs4 lac
Cosmetic & Gift Shop Project Report
1. Total project Cost Rs 8 Lac as per PMEGP
2. Space requirement 250 Sq. ft To 500 sq ft.
3. Product stock Cost Rs 6lac.
4. interior and other expenses Rs 2 lac
Disposable Syringe Manufacturing Plant project report
1. Total project Cost Rs 2crore as per CGTMSE Scheme
2. Land requirement is 3000 Sq.ft.
3. Disposable syringe manufacturing small plant Cost Rs 1.5 crore.
4. Per Day injection syringe manufacturing depends upon the market demand.
Fly Ash Bricks Project Report
1. Total project Cost Rs 30 Lac as per CGTMSE Scheme
2. Land requirement is 8000 Sq.ft To 1 Acre
3. Machine Cost Rs 1660000 fully automatic fly ash bricks and paver block machine
4. Per Day Ten Thousand Bricks Production capacity machine
Grocery Store / Mini Supermarket Project Report
1. Total project Cost Rs 11 Lac as per PMEGP
2. Space requirement 500 Sq. ft To1000 sq ft.
3. Product stock Cost Rs 7 lac.
4. One get loan under PMEGP as per this report.
Masala Factory Project report
1. Total project Cost Rs 16 Lac as per PMEGP
2. Land requirement is 1200sq. ft.
3. All Machine Cost Rs 8 lac fully automatic.
4. working capital, raw material and other expenses Rs 8 lac
Oxygen Plant Project Report
1. Total project Cost Rs 2crore as per CGTMSE Scheme
2. Land requirement is 3000 Sq.ft.
3. Disposable syringe manufacturing small plant Cost Rs 1.5 crore.
4. Project report is prepared by CA.
Paper Plate Project report
1. Total project Cost Rs 10 Lac as per PMEGP
2. Land requirement is 800sq. ft.
3. Machine Cost Rs 4 lac approx.
4. working capital, raw material, and other expenses Rs 6lac
Poultry farming project report
1. Poultry farming total project Cost Rs 10 lac as per CGTMSE Scheme
2. Land requirement is 2000 Sq.ft.
3. 2000 chickens can be farmed.
4. Project report is prepared by CA.
Readymade cloth Shop
1. Total project Cost Rs 10 Lac as per MUDRA
2. Space requirement 250 Sq. ft To 500 sq ft.
3. Stock of cloth Shop Rs 5lac.
4. interior and other expenses Rs 5 lac
Restaurant Business Project Report
1. Total project Cost Rs 15 Lac as per PMEGP
2. Space requirement 250 Sq. ft To500 sq ft.
3. Restaurant utensils and other stock Cost Rs 4 lac.
4. interior, working capitaland other expenses Rs 11 lac