CGTMSE

Credit Guarantee Funds Trust for Micro and Small Enterprises (CGTMSE) is a trust established by the Government of India, Ministry of Medium, Small and Micro Enterprises (MSME), and Small Industries Development Bank of India (SIDBI).

Launched in 2000, CGTMSE offers credit guarantees to financial institutions that provide loans to MSMEs. CGTMSE provides a guarantee to lending institutions up to a certain limit for all lending done by them to the MSME sector.

CGTMSE Scheme Eligibility Criteria:-

  • Lending institutions that provide funding support to specific sectors are in agreement with CGTMSE. The entities and institutions that are eligible to avail loans under the CGTMSE scheme are as follows:
  • Lending Borrowers
  • All Existing and New Small and Medium Enterprises (SMEs)
  • Lending Institutions
  • Scheduled Commercial Banks (SCBs)
  • Regional Rural Banks (RRBs)
  • Small Finance Banks (SFBs)
  • Non-banking Financial Companies (NBFCs)
  • Small Industrial Development Bank of India (SIDBI)
  • National Small Industries Corporation (NSIC)
  • North Eastern Development Finance Corporation Ltd. (NEDFi
CGTMSE

Showing all 5 results

Show:
construction waste recycling business project report cover in hand

Construction waste recycling business

3.5 ★
3.5 ★
4 Ratings
5 ★
1
4 ★
0
3 ★
3
2 ★
0
1 ★
0
Highlights:

1. Total project Cost Rs 10 Lac as per PMEGP

2. Space requirement 250 Sq. ft To500 sq ft.

3. Construction waste recycling business Cost Rs 6lac.

4. Machine and other expenses Rs4 lac

6,500 57% Off
Disposable Syringe Project Report Two BooksDisposable Syringe Project Report single Books

Disposable Syringe Manufacturing Plant project report

4.4 ★
4.4 ★
27 Ratings
5 ★
15
4 ★
7
3 ★
5
2 ★
0
1 ★
0
Highlights:

1. Total project Cost Rs 2crore as per CGTMSE Scheme

2. Land requirement is 3000 Sq.ft.

3. Disposable syringe manufacturing small plant Cost Rs 1.5 crore.

4. Per Day injection syringe manufacturing depends upon the market demand.

35,000 13% Off
cgtmse fly ash bricks project report with three book cover setfly ash bricks cgtmse

Fly Ash Bricks Project Report

4.3 ★
4.3 ★
4 Ratings
5 ★
1
4 ★
3
3 ★
0
2 ★
0
1 ★
0
Highlights:

1. Total project Cost Rs 30 Lac as per CGTMSE Scheme

2. Land requirement is 8000 Sq.ft To 1 Acre

3. Machine Cost Rs 1660000 fully automatic fly ash bricks and paver block machine

4. Per Day Ten Thousand Bricks Production capacity machine

7,999 47% Off
oxygen plant project costoxygen plant project report

Oxygen Plant Project Report

4.2 ★
4.2 ★
5 Ratings
5 ★
3
4 ★
0
3 ★
2
2 ★
0
1 ★
0
Highlights:

1. Total project Cost Rs 2crore as per CGTMSE Scheme

2. Land requirement is 3000 Sq.ft.

3. Disposable syringe manufacturing small plant Cost Rs 1.5 crore.

4. Project report is prepared by CA.

14,999 57% Off
BROILER-POULTRY-TWO-BOOKSBROILER-POULTRY-single-book

Poultry farming project report

4.4 ★
4.4 ★
7 Ratings
5 ★
4
4 ★
2
3 ★
1
2 ★
0
1 ★
0
Highlights:

1. Poultry farming total project Cost Rs 10 lac as per CGTMSE Scheme

2. Land requirement is 2000 Sq.ft.

3. 2000 chickens can be farmed.

4. Project report is prepared by CA.

4,999 67% Off
Scroll To Top
Close
Close
Services
Filters
0 Wishlist
0 Cart
Close

My Cart

Shopping cart is empty!

Continue Shopping