PMEGP Loan :- Up to Rs. 25 lacs
The PMEGP loan scheme is implemented by Khadi and the Village Industries Commission (KVIC), which functions as the nodal agency at the national level. The Prime Minister’s Employment Generation Program provides business loans up to Rs 25 lakh. On the portal, guidelines have been provided for the PMEGP project. One can get the project list over there. For a PMEGP loan, you have to submit a DPR, i.e., a detailed project report, to the bank. Afterwards, you have to submit a PMEGP online application to apply for a loan. The online application generally takes more than one month to get approved. A PMEGP loan is provided as a term loan. The loan interest rate may vary from 10% to 13%. In PMEGP, loan subsidies are provided to all castes. The subsidy amount may vary from 25% to 35%.
Chowmein Making Business Project Report
1. Total project Cost Rs 21 Lac as per PMEGP
2. Land requirement is 2000sq. ft.
3. All Machine Cost Rs 10lac fully automatic.
4. working capital, raw material, and other expenses Rs 11lac
E-commerce Business Project Report
- Total project Cost Rs 10 Lac as per PMEGP
- Space requirement 250 Sq. ft To500 sq ft.
- Equipment’s and software Cost Rs 6lac.
- working capital and other expenses Rs 4 lac
Flour Mill / Aata Factory Project report
1. Total project Cost Rs 22 Lac as per PMEGP
2. Land requirement is 3000 sq. ft.
3. Machine Cost Rs 10lac fully automatic Flour Mill
4. Per Hour Production capacity 500kg
Fly Ash Bricks Project Report
1. Total project Cost Rs 24.95 Lac as per PMEGP
2. Land requirement is 8000 Sq.ft To 1 Acre
3. Machine Cost Rs 1660000 fully automatic fly ash bricks and paver block machine
4. Per Day Ten Thousand Bricks Production capacity machine
Hawai Chappal manufacturing
1. Total project cost: Rs 5 Lac as per PMEGP
2. Land requirement is 500 sqt to 1000 sq ft.
3. Slipper making business project report pdf is fully bankable.
4. This project report is made by an expert CA.
Manufacturing of distemper and paint form cowdung
1. Total project Cost Rs 20 Lac as per Pmegp.
2. Space requirement 1500 sq ft.
3. This project report can be used for another loan scheme also.
4. Distemper and Paint from the Cowdung project report is made by an expert CA.
Paver Block Making Business Project Report
1. Total project Cost Rs 24.95 Lac as per PMEGP
2. Land requirement is 8000 Sq.ft to 1 Acre
3. Machine Cost Rs 1660000 fully automatic Paver Block Making Business and paver block machine.
4. Per Day Ten Thousand Bricks Production capacity machine