Eye care and optical shop

Previous product
Digital marketing Original price was: ₹10,000.Current price is: ₹3,999.
Next product
Health & Wellness Original price was: ₹15,000.Current price is: ₹4,999.
4.5 ★
4.5 ★
2 Ratings
5 ★
1
4 ★
1
3 ★
0
2 ★
0
1 ★
0
(2 customer reviews)

Original price was: ₹10,000.Current price is: ₹4,999.

50% Off
Close
Price Summary
  • 10,000
  • 4,999
  • 50%
  • 4,999
  • Overall you save 5,001 (50%) on this product
In Stock
Highlights:

1. Total project Cost Rs 10 Lac as per MUDRA

2. Space requirement 250 Sq. ft To 500 sq ft.

3. Eye care and optical shop Rs 6lac.

4. interior and other expenses Rs 4 lac

Category:
Description

Content of Project report 

Sr. No. Particulars
1 Project at Glance
2 An Overview
3 Basis and presumption of Project report
4 Market Potential
5 Product Description
6 Industrial Scenario
7 Required Raw Material
8 Manufacturing Process
9 Indian Standards
10 Inspection and quality control
11 Land and space requirement
12 Plant And Machinery
13 Location advantages
14 Manpower Requirement
15 Other Utilities
16 Licenses
17 Power Requirement
18 Cost Of Project
19 Means Of Finance
20 5 year Projected Balance Sheet
21 Projected Profitability Statement
22 Cash Flow Statement
23 Depreciation chart
24 Assessment Of Working Capital
25 Computation Of Sale
26 Closing Stock
27 Calculation Of D.S.C.R
28 Risk rating ratio
29 Repayment Schedule Of Term Loan
30 Performance and Financial Indicators
31 Profitability Ratios With Graphs
32 Break-even Point Analysis
33 Implementation Schedule
34 Assumptions

Project Overview

 

  1. Fly ash bricks project report is prepared as per the bank’s standard and PMEGP guidelines.
  2. The machine cost of Rs 1660000 has been taken which is a fully automatic machine.
  3. This machine is capable of producing fly ash bricks, paver blocks, zig-zag paver blocks, cemented bricks, and hollow bricks.
  4. In the project report, we have taken the land provision of 8000 sq ft to 1 acre.
  5. The total project cost is Rs 24.95 lac out of which Rs 1660000-/ is the cost of the machine and in rest amount its working capital as well as other expenses.
  6. There is a projected balance sheet of Five years in which the future performance of the company is shown.
  7. This project report is updated on a timely basis and no error is there.
  8. For any kind of changes in the project report, it’s totally free; provided it must be addressed to our team within a week of downloading.
  9. For any changes after one week of downloading extra charges will be applicable.

Sample Project Report 

Uploading soon …….

1. Is this a bankable project report?

Ans:- Yes its a fully bankable project report

2. What if I didn’t receive the project report after payment?

Ans:- It won’t happen we guarantee but in case it happens then You will receive it by mail for sure.

3. Is it possible to get the loan on basis of this project report?

Ans:-  Yes you will get a loan for sure.

4. Can I get the project report as per my own requirement?

Ans:- Yes we will prepare as per your need. you will have to mail for customized project report.

5. Who has prepared this project report?

Ans:- We have chartered accountants and company secretaries in our team. It is prepared by the experts so you don’t have to worry.

Reviews (2)
4.5 ★
2 Ratings
5 ★
1
4 ★
1
3 ★
0
2 ★
0
1 ★
0
  1. 4 ★
    4.5 ★
    2 Ratings
    5 ★
    1
    4 ★
    1
    3 ★
    0
    2 ★
    0
    1 ★
    0

    Meghna true value Shop

    All ok for bigner and support for set-up and renegations of buisness

  2. 5 ★
    4.5 ★
    2 Ratings
    5 ★
    1
    4 ★
    1
    3 ★
    0
    2 ★
    0
    1 ★
    0

    Meghna true value Shop

    Help for ex-servicemen for there’s no employees in State

Add a review

Your email address will not be published. Required fields are marked *

Scroll To Top
Close
Close
Close

My Cart

Shopping cart is empty!

Continue Shopping

Open chat
Hello
Can we help you?