Download Project Report for bank loan
(Showing 25 – 36 products of 40 products)
Manufacturing of distemper and paint form cowdung
1. Total project cost: Rs 20 lakh as per Pmegp.
2. Space requirement: 1500 sq ft.
3. This project report can be used for another loan scheme as well.
4. Distemper and Paint from the Cowdung project report are made by an expert CA.
Masala Factory Project report
1. Total project cost: Rs 10 lakh as per PMEGP
2. The masala factory project is prepared by an expert CA.
3. The DSCR ratio, 5-year balance sheet, profit and loss account, and working capital calculation are properly done.
4. 60% capital expenditure and 40% working capital have been taken, which is as per PMEGP guideline
Medical Store Project Report
1. Total project Cost Rs 10 Lac as per PMEGP
2. Space requirement 250 Sq. ft To500 sq ft.
3. Medicine stock Cost Rs 6lac.
4. interior and other expensesRs 4 lac
Mop manufacturing
1. Total project Cost Rs 5 Lac as per MUDRA
2. Space requirement 250 Sq. ft To 500 sq ft.
3. Mop-making machine price Rs 2lac.
4. Raw material and other expenses Rs 3 lac
Mushroom Farming Project Report
1. Total project cost: Rs 5 Lac as per MUDRA
2. Fully bankable & made as per the standard of RBI and banks.
3. 5-year balance sheet, DSCR, P&L, working capital.
4. project report made by CA
Organic gulal manufacturing project report pdf
1. Total project Cost Rs 5 Lac as per PMEGP
2. Land requirement is 500 Sq.ft To 1000 sq ft.
3. Organic gulal project report pdf is prepared as per PMEGP guideline
4. Made by Chartered Accountant.
Oxygen bottling plant Project Report
1. Total project Cost Rs 2crore as per CGTMSE Scheme
2. five year balance sheet, working capital, DSCR, P&L etc .
3. Oxygen bottling plant project report pdf.
4. The project report is prepared by CA, 100% loan guaranteed.
Paper Plate Project report
1. Total project Cost Rs 10 Lac as per PMEGP
2. Land requirement is 800sq. ft.
3. Machine Cost Rs 4 lac approx.
4. working capital, raw material, and other expenses Rs 6lac
Paver Block Making Business Project Report
1. Total project cost: Rs 25 lakh as per PMEGP
2. The DSCR ratio, 5-year balance sheet, profit and loss account, and working capital calculation are properly done.
3. 60% capital expenditure and 40% working capital have been taken, which is as per PMEGP guideline
4. Made by CA.
Poultry farming project report
1. Poultry farming total project Cost Rs 10 lac as per CGTMSE Scheme
2. Land requirement is 2000 Sq.ft.
3. 2000 chickens can be farmed.
4. Project report is prepared by CA.
PVC pipe project report
1. The PVC pipe total project cost is Rs 50 lakh as per the PMEGP scheme.
2. Space requirement: 1000 Sq. ft. To 1500 sq. ft.
3. The DSCR ratio, 5-year balance sheet, profit and loss account, and working capital calculation are properly done.
4. 60% capital expenditure and 40% working capital have been taken which is as per PMEGP guideline
Readymade cloth Shop
1. Total project Cost Rs 10 Lac as per MUDRA
2. Space requirement 250 Sq. ft To 500 sq ft.
3. Stock of cloth Shop Rs 5lac.
4. interior and other expenses Rs 5 lac