Credit Guarantee Funds Trust for Micro and Small Enterprises (CGTMSE) is a trust established by the Government of India, Ministry of Medium, Small and Micro Enterprises (MSME), and Small Industries Development Bank of India (SIDBI).
Launched in 2000, CGTMSE offers credit guarantees to financial institutions that provide loans to MSMEs. CGTMSE provides a guarantee to lending institutions up to a certain limit for all lending done by them to the MSME sector.
CGTMSE Scheme Eligibility Criteria:-
- Lending institutions that provide funding support to specific sectors are in agreement with CGTMSE. The entities and institutions that are eligible to avail loans under the CGTMSE scheme are as follows:
- Lending Borrowers
- All Existing and New Small and Medium Enterprises (SMEs)
- Lending Institutions
- Scheduled Commercial Banks (SCBs)
- Regional Rural Banks (RRBs)
- Small Finance Banks (SFBs)
- Non-banking Financial Companies (NBFCs)
- Small Industrial Development Bank of India (SIDBI)
- National Small Industries Corporation (NSIC)
- North Eastern Development Finance Corporation Ltd. (NEDFi
Ash brick plant project report
1. Total project Cost Rs 30 Lac as per CGTMSE Scheme
2. Land requirement is 8000 Sq.ft To 1 Acre
3. Ash brick plant project report is fully bankable.
4. Ash bricks project report is made by an expert CA.
Cloth Business project report
1. Total project Cost Rs 16 Lac as per PMEGP
2. Space requirement 500 Sq. ft To1000 sq ft.
3. Product stock Cost Rs 8lac.
4. interior, working capital and other expenses Rs 8 lac
Construction waste recycling business
1. Total project Cost Rs 10 Lac as per PMEGP
2. Space requirement 250 Sq. ft To500 sq ft.
3. Construction waste recycling business Cost Rs 6lac.
4. Machine and other expenses Rs4 lac
Dairy Business Project Report
- Total project Cost Rs 36 Lac as per CGTMSE scheme.
- Space requirement 5000 Sq. ft to10000sq ft.
- Cost of 50 cattle (cow or buffalo) Rs 31lac.
- Shed, working capitaland other expenses Rs 5 lac
Disposable Syringe Manufacturing Plant project report
1. Total project Cost Rs 2.61crore as per CGTMSE Scheme
2. Land requirement is 3000 Sq.ft. +
3. Disposable syringe manufacturing small plant Cost Rs 1.53 crore.
4. Per Day injection syringe manufacturing depends upon the market demand.
Health & Wellness
1. Total project Cost Rs 10 Lac as per MUDRA
2. Space requirement 250 Sq. ft To 500 sq ft.
3. Health and wellness Cost Rs 6lac.
4. interior and other expenses Rs 4 lac
Medical Store Project Report
1. Total project Cost Rs 10 Lac as per PMEGP
2. Space requirement 250 Sq. ft To500 sq ft.
3. Medicine stock Cost Rs 6lac.
4. interior and other expensesRs 4 lac
Oxygen bottling plant Project Report
1. Total project Cost Rs 2crore as per CGTMSE Scheme
2. five year balance sheet, working capital, DSCR, P&L etc .
3. Oxygen bottling plant project report pdf.
4. The project report is prepared by CA, 100% loan guaranteed.
Poultry farming project report
1. Poultry farming total project Cost Rs 10 lac as per CGTMSE Scheme
2. Land requirement is 2000 Sq.ft.
3. 2000 chickens can be farmed.
4. Project report is prepared by CA.
Supermarket Project Report
- Total project Cost Rs 48 Lac as per CGTMSE scheme.
- Space requirement 2000 Sq. ft to3000sq ft.
- Product stock Cost Rs 20 lac.
- interior, working capitaland other expenses Rs 19 lac
- Promotor’s contribution Rs 9 lac