Download Project Report for bank loan
(Showing 1 – 12 products of 40 products)
Ash brick plant project report
1. Total project Cost Rs 30 Lac as per CGTMSE Scheme
2. Land requirement is 8000 Sq.ft To 1 Acre
3. Ash brick plant project report is fully bankable.
4. Ash bricks project report is made by an expert CA.
Bamboo Shoot business
1. Total project Cost Rs 11.25 Lac as per PMEGP
2. Land requirement is 500 Sq.ft To 1000 sq ft.
3. Bamboo shoot project report as per bank standard.
4. Made by CA .
Boutique business
1. Total project Cost Rs 10 Lac as per MUDRA
2. Space requirement 250 Sq. ft To 500 sq ft.
3. Boutique business stock Cost Rs 6lac.
4. interior and other expenses Rs 4 lac
Chowmein Making Business Project Report
1. Total project Cost Rs 10 Lac as per PMEGP
2. Land requirement is 1000 sq. ft.
3. working capital, DSCR, five year balance sheet etc.
4. Noodles Manufacturing Plant Project Report made by CA. 100% guaranteed.
Cloth Business project report
1. Total project Cost Rs 16 Lac as per PMEGP
2. Space requirement 500 Sq. ft To1000 sq ft.
3. Product stock Cost Rs 8lac.
4. interior, working capital and other expenses Rs 8 lac
Cloth manufacturing
1. Total project Cost Rs 11 Lac as per PMEGP
2. Land requirement is 500 Sq.ft approx.
3. Cloth Stitching machine 400,000
4. Loan period is 5 years.
Cloud Kitchen Project Report
1. Total project cost: Rs 10 Lac.
2. Five years balance sheet, P&L , working capital, DSCR ratio.
3. The cloud kitchen project report is prepared as per bank standards.
4. Made by CA (chartered accountant).
Construction waste recycling business
1. Total project Cost Rs 10 Lac as per PMEGP
2. Space requirement 250 Sq. ft To500 sq ft.
3. Construction waste recycling business Cost Rs 6lac.
4. Machine and other expenses Rs4 lac
Cosmetic & Gift Shop Project Report
1. Total project cost: Rs 10 lakh as per PMEGP
2. Space requirement: 250 Sq. ft To 500 sq. ft.
3. Product stock Cost Rs 8 lac.
4. interior and other expenses Rs 2 lac
Dairy Business Project Report
- Total project Cost Rs 36 Lac as per CGTMSE scheme.
- Space requirement 5000 Sq. ft to10000sq ft.
- Cost of 50 cattle (cow or buffalo) Rs 31lac.
- Shed, working capitaland other expenses Rs 5 lac
Detailed Project Report on Polythene Bags
1. Total project cost: Rs 10 lakh as per PMEGP and bank standards.
2. DSCR is 5, which is within the benchmark
3. Term loan: 60% and cash credit: 40%, which is as per bank standard and PMEGP guidelines
4. Made by experienced chartered Accountants (CA).
Digital marketing
1. Total project Cost Rs 10 Lac as per MUDRA
2. Space requirement 250 Sq. ft To 500 sq ft.
3. Digital marketing Rs 6lac.
4. interior and other expenses Rs 4 lac