Download Project Report for bank loan
(Showing 13 – 24 products of 40 products)
Disposable Syringe Manufacturing Plant project report
1. Total project Cost Rs 2.61crore as per CGTMSE Scheme
2. Land requirement is 3000 Sq.ft. +
3. Disposable syringe manufacturing small plant Cost Rs 1.53 crore.
4. Per Day injection syringe manufacturing depends upon the market demand.
E commerce Project Report
- Total project Cost Rs 10 Lac as per banks guideline.
- In Mudra scheme, E-commerce Project is applicable for loan
- This report is fully bankable.
- Made by an expert CA, 100% loan guarantee.
Edible oil manufacturing plant project report
1. Total project Cost Rs 10 Lac as per PMEGP and banks standard.
2. DSCR is 5 which is within the benchmark
3. Term loan 60% and cash credit 40% which is as per banks standard and PMEGP guidelines
4. Made by Experienced Chartered accountants (CA).
Eye care and optical shop
1. Total project Cost Rs 10 Lac as per MUDRA
2. Space requirement 250 Sq. ft To 500 sq ft.
3. Eye care and optical shop Rs 6lac.
4. interior and other expenses Rs 4 lac
flour mill project report
1. Total project Cost Rs 20 Lac as per PMEGP
2. Atta plant project is fully bankable.
3. Flour mill project report contain, balance sheet, working capital, P&l, DSCR etc.
4. Made by an expert CA.
Fly Ash Bricks Project Report
1. Total project Cost Rs 30 Lac as per MSME SCHEME
2. Land requirement is 8000 Sq.ft To 1 Acre
3. Machine Cost Rs 1660000 fully automatic fly ash bricks and paver block machine
4. Per Day Ten Thousand Bricks Production capacity machine
Fly Ash Bricks Project Report
1. Total project cost: Rs 25 lakh as per PMEGP (It can be changed after download)
2. Five-year balance sheet, working capital, DSCR, P&L.
3. fly ash brick plant project report pdf is fully bankable.
4. Made by an expert CA, 100% loan guaranteed.
Gift and Cosmetic shop Project Report
1. Total project Cost Rs 8 Lac as per PMEGP
2. Space requirement 250 Sq. ft To 500 sq ft.
3. Product stock Cost Rs 6lac.
4. interior and other expenses Rs 2 lac
Grocery Store / Mini Supermarket Project Report
1. Total project Cost Rs 11 Lac .
2. Space requirement 500 Sq. ft To1000 sq ft.
3.The DSCR ratio, 5-year balance sheet, profit and loss account, and working capital calculation are properly done.
4. Made by an expert CA.
Hawai Chappal manufacturing
1. Total project cost: Rs 5 Lac as per PMEGP
2. Land requirement is 500 sqt to 1000 sq ft.
3. Slipper making business project report pdf is fully bankable.
4. This project report is made by an expert CA.
Health & Wellness
1. Total project Cost Rs 10 Lac as per MUDRA
2. Space requirement 250 Sq. ft To 500 sq ft.
3. Health and wellness Cost Rs 6lac.
4. interior and other expenses Rs 4 lac
Idol making project report
1. Total project Cost Rs 10 Lac as per PMEGP
2. The land requirement is 500 Sq.ft To 1000 sq ft.
3. Idol making project report is prepared as per bank standards.
4. Made by Chartered Accountants.