Download Project Report for bank loan

Download Project Report for bank loan

(Showing 13 – 24 products of 40 products)

Show:
Disposable Syringe Project Report Two BooksDisposable Syringe Project Report single Books

Disposable Syringe Manufacturing Plant project report

4.4 ★
4.4 ★
38 Ratings
5 ★
22
4 ★
9
3 ★
7
2 ★
0
1 ★
0
Highlights:

1. Total project Cost Rs 2crore as per CGTMSE Scheme

2. Land requirement is 3000 Sq.ft.

3. Disposable syringe manufacturing small plant Cost Rs 1.5 crore.

4. Per Day injection syringe manufacturing depends upon the market demand.

Original price was: ₹40,000.Current price is: ₹35,000. 13% Off
Featured
image of PROJECT REPORT ON E-COMMERCE

E commerce Project Report

4.8 ★
4.8 ★
5 Ratings
5 ★
4
4 ★
1
3 ★
0
2 ★
0
1 ★
0
Highlights:
  1. Total project Cost Rs 10 Lac as per banks guideline.
  2. In Mudra scheme, E-commerce Project is applicable for loan
  3. This report is fully bankable.
  4. Made by an expert CA, 100% loan guarantee.
Original price was: ₹10,000.Current price is: ₹3,999. 60% Off

Edible oil manufacturing plant project report

Highlights:

1. Total project Cost Rs 10 Lac as per PMEGP and banks standard.

2. DSCR is 5 which is within the benchmark

3. Term loan 60% and cash credit 40% which is as per banks standard and PMEGP guidelines

4. Made by Experienced Chartered accountants (CA). 

Original price was: ₹10,000.Current price is: ₹4,999. 50% Off
eye care and optical shop project report cover in hand

Eye care and optical shop

4.5 ★
4.5 ★
2 Ratings
5 ★
1
4 ★
1
3 ★
0
2 ★
0
1 ★
0
Highlights:

1. Total project Cost Rs 10 Lac as per MUDRA

2. Space requirement 250 Sq. ft To 500 sq ft.

3. Eye care and optical shop Rs 6lac.

4. interior and other expenses Rs 4 lac

Original price was: ₹10,000.Current price is: ₹4,999. 50% Off
Featured
pmegp flour mill project report with single open cover bookpmegp flour mill project report with three book cover set

flour mill project report

4.5 ★
4.5 ★
48 Ratings
5 ★
32
4 ★
10
3 ★
4
2 ★
1
1 ★
1
Highlights:

1. Total project Cost Rs 20 Lac as per PMEGP

2. Atta plant project is fully bankable.

3. Flour mill project report contain, balance sheet, working capital, P&l, DSCR etc.

4. Made by an expert CA.

Original price was: ₹15,000.Current price is: ₹5,999. 60% Off
pmegp scheme fly ash bricks project report with three cover page books set

Fly Ash Bricks Project Report

4.8 ★
4.8 ★
5 Ratings
5 ★
4
4 ★
1
3 ★
0
2 ★
0
1 ★
0
Highlights:

1. Total project Cost Rs 30 Lac as per MSME SCHEME

2. Land requirement is 8000 Sq.ft To 1 Acre

3. Machine Cost Rs 1660000 fully automatic fly ash bricks and paver block machine

4. Per Day Ten Thousand Bricks Production capacity machine

Original price was: ₹20,000.Current price is: ₹4,999. 75% Off
Featured
pmegp scheme fly ash bricks project report with double cover page books setpmegp scheme fly ash bricks project report with three cover page books set

Fly Ash Bricks Project Report

4.8 ★
4.8 ★
53 Ratings
5 ★
44
4 ★
5
3 ★
4
2 ★
0
1 ★
0
Highlights:

1. Total project cost: Rs 25 lakh as per PMEGP (It can be changed after download)

2. Five-year balance sheet, working capital, DSCR, P&L.

3. fly ash brick plant project report pdf is fully bankable.

4. Made by an expert CA, 100% loan guaranteed.

Original price was: ₹12,000.Current price is: ₹5,999. 50% Off
Featured
mudra loan cosmetics & gift shop project report with three books setmudra loan cosmetics & gift shop project report single open books

Gift and Cosmetic shop Project Report

3.7 ★
3.7 ★
3 Ratings
5 ★
1
4 ★
0
3 ★
2
2 ★
0
1 ★
0
Highlights:

1. Total project Cost Rs 8 Lac as per PMEGP

2. Space requirement 250 Sq. ft To 500 sq ft.

3. Product stock Cost Rs 6lac.

4. interior and other expenses Rs 2 lac

Original price was: ₹10,000.Current price is: ₹2,999. 70% Off
Featured
pmegp Grocery Store Project Report with double book cover setpmegp Grocery Store Project Report with three book cover set

Grocery Store / Mini Supermarket Project Report

4.3 ★
4.3 ★
7 Ratings
5 ★
4
4 ★
1
3 ★
2
2 ★
0
1 ★
0
Highlights:

1. Total project Cost Rs 11 Lac .

2. Space requirement 500 Sq. ft To1000 sq ft.

3.The DSCR ratio, 5-year balance sheet, profit and loss account, and working capital calculation are properly done.

4. Made by an expert CA.

Original price was: ₹10,000.Current price is: ₹5,000. 50% Off

Hawai Chappal manufacturing

5 ★
5 ★
1 Rating
5 ★
1
4 ★
0
3 ★
0
2 ★
0
1 ★
0
Highlights:

1. Total project cost: Rs 5 Lac as per PMEGP

2. Land requirement is 500 sqt to 1000 sq ft. 

3. Slipper making business project report pdf is fully bankable.

4. This project report is made by an expert CA.

Original price was: ₹6,000.Current price is: ₹2,999. 50% Off
health and wellness project report cover in hand

Health & Wellness

3 ★
3 ★
2 Ratings
5 ★
0
4 ★
1
3 ★
0
2 ★
1
1 ★
0
Highlights:

1. Total project Cost Rs 10 Lac as per MUDRA

2. Space requirement 250 Sq. ft To 500 sq ft.

3. Health and wellness Cost Rs 6lac.

4. interior and other expenses Rs 4 lac

Original price was: ₹15,000.Current price is: ₹4,999. 67% Off

Idol making project report

Highlights:

1. Total project Cost Rs 10 Lac as per PMEGP

2. The land requirement is 500 Sq.ft To 1000 sq ft.

3. Idol making project report is prepared as per bank standards.

4. Made by Chartered Accountants.

Original price was: ₹10,000.Current price is: ₹4,999. 50% Off
Scroll To Top
Close
Close
Close

My Cart

Shopping cart is empty!

Continue Shopping

Sidebar
Open chat
Hello
Can we help you?